Tugaske Project Highlights
The Tugaske Project is a modular potash project, located on Gensource’s Vanguard potash mining lease area in south-central Saskatchewan.
Situated on 35 sq km within the Vanguard lease area (over 324 sq km area) it will initially comprise 2 potash production modules of 250,000 t/y each for a total of 500,000 t/y
Designed minimum production of 500,000 metric tonne per annum of saleable MOP using Gensource’s selective solution extraction method. Will be scalable to 1 million t/y
- Technical and economic feasibility of the Tugaske Project confirmed
- Technical Update currently in process for expansion to 500,000 t/yr with upcoming NI 43-101 to follow
- Leaves no tailings on surface (minimizing decommissioning risk)
- Avoids up to 1 million tonnes/year of waste salt tailings at 500,000 t/yr production
- Requires no brine ponds (eliminating significant environmental issues) while decreasing decommissioning risk
- Small physical footprint (eases public concern/social risk)
- Located on or very close to
−Road and rail access
−Natural gas, power and water - Saskatchewan is well set-up for potash production, with technical and logistical resources readily available.
- Saskatchewan Ministry of Environment determined no Environmental Impact Assessment (EIA) was required due to the Tugaske Project’s negligible environmental impact
- The project was determined to be ‘not a development’ because it does not trigger the need for an EIA – proof of the environmentally sustainable approach
- Tested and proven extraction methods
- State of the art processing techniques
- Committed off take partner
- Results in robust economics
A technical report update is currently underway after the completion of an exclusivity agreement (“EA”) with a large and diversified Southeast Asian conglomerate (“ASEAN Partner”) with respect to the Company’s Tugaske Project (the “Project” or “Tugaske”). Under the terms of the EA, the ASEAN Partner is committed to fund a Technical Update - a defined engineering scope of work aimed at updating technical details of the Project to match the ASEAN Partner’s investment requirements
The update will refresh construction and operating cost estimates and develop capital budgets for a minimum 500,000 metric tonnes per year facility – double the size of the original Tugaske Project
The report is currently over 60% complete and is expected to be published in the fall of 2026
Selective solution mining is an advanced form of solution mining that is designed to dissolve potassium chloride (KCl) while leaving most of the sodium chloride (NaCl) behind. Unlike conventional solution mining, which dissolves both salts and requires extensive surface processing to separate them, selective solution mining aims to recover a much higher-grade potash brine directly from the underground deposit
The process begins by drilling a pair of wells into the potash-bearing formation. A specially formulated heated brine—already saturated with sodium chloride—is injected into the ore body. Because the brine is already saturated with NaCl, it has very little capacity to dissolve additional salt. Instead, it preferentially dissolves the potassium chloride, producing a potassium-rich brine that is pumped back to the surface through a production well